Successful Projects

We present to you our successful projects, demonstrating the impact we’ve made across various industries. Our case studies provide in-depth insights into the challenges we’ve tackled and the innovative solutions we’ve delivered. Explore these stories to see how we’ve helped our clients achieve remarkable results.

designer in formal wear and glasses draws a diagram on paper

Project K – Deescalation

The ramp-up of serial production for door trims for a Premium OEM, which was the most important project for the group, was successfully executed. This Greenfield project had an estimated value of 50M – 100M EUR. We provided extensive support, including process establishment, de-escalation, customer communication, crisis management, logistical flow, sampling, and industrialization.

The main issues are as follows:

  • The planning of project was inaccurately estimated.
  • The transfer of documentation from headquarters was not completed.
  • The pre-serial phase was not properly handled.
  • Industrialization was not finished on time with 50% of the shopfloor workforce missing.
  • The above contributors resulted in very short period to postponement of SOP at the OEM customer and difficult ramp up and a complicated relationship with the customer, leading to a high level of escalation.
  • GQ reinforced the original hard-pressed team with 15 white collars (managers and engineers – industrialization, quality, project mgr, logistic, engineering, production) and 5 technicians (shop floor quality) and 20+ blue collars successfully installed within the first 2 weeks following original demand.
  • Highest peak of support: 50+ direct people on support and another 100+ indirect (via partner companies).
  • Management of project departments.
  • The customer received strong support to overcome extremely complex problems when the issue started.
  • The customer received expertise of GQ interim professionals who made good and efficient decisions in a short period of time.
  • GQ interim professionals handled difficult communication with an exceptionally demanding customer.
  • Management of project departments.
  • GQ ran a solution on another similar project in pipeline to avoid the same problems in the pre-serial phase.
  • Over the course of 1 year, GQ interim professionals managed to achieve a de-escalation level and resolve most of the problems.
  • Our customer went from heavy crisis firefighting to standard operational conditions with a happy customer and a smoothly running project.
  • In one year, GQ significantly helped our client out of a very deep crisis, tighten relationships with their biggest customer and to resolve seemingly unsolvable problems.
  • At the same time the customer received support with an ongoing project which did not experience the same issues.
auto mechanic man with wrench and lamp working at workshop

Project S -
Sampling

The customer was launching several new projects simultaneously and required interim help to manage all APQP processes and receive PPAP approvals on time.

Projects: Audi Q7, Audi Q8, Porsche Cayenne, Porsche Cayenne Coupe, Volkswagen Touareg.

1 customer submitted 5 different products at the same time which put an additional strain on ramp-up times.

A team of 5 highly skilled interim APQP engineers resolved the project to obtain Green approval from the final customer. This meant completion within 17 months as originally planned without delays or unexpected complications.

  • No need to hire internal staff for limited project tasks
  • Time and resource saving
  • On time and reliable delivery
  • High satisfaction of high-profile OEM

Very precise operation with high performance APQP interim engineers who drove the project through all milestones to the successful PPAP and handover to serial production.

interim manager in gray suit and with helmet on head using tablet while standing in power plant

Project R - Relocation of the production line

This project involves the careful transfer of critical manufacturing processes to a new location, ensuring minimal disruption while maximizing productivity and maintaining the highest quality standards.

  • Dismantling in CZ
  • Packing
  • Transportation
  • Assembly
  • Commissioning the line