Why Quality Control Chart Matters

Is using pre-control charts effective for process or just time wasting? Many specialists disagree about pre-control’s definition as a SPC tool. Are important in process setting or not?

Table of Contents

Share
Worker standing in a warehouse with clipchart in hands, checking control
Article overview
Completed projects
0 +
Returning customers
0 %

Pre-Control Charts

There are 2 basic philosophical differences between those who support and those who support pre-control charts. The pre control fans keep to view any product within specification as good. All results are considered to be “good” or “bad” and the dividing line is a sharp cliff. A part that barely meets specification is as good as a part that is perfectly centered on the target (T) value. Producing product tighter than the specification limits is viewed as an unnecessary expense.

“Good” within product specifications

This technique targets on the voice of the customer in that the pre-control limits are based on upper and lower specification limits (USLs and LSLs). These limits are chosen such that the hard stop limit to pre-control charts are at the customer specification and cautionary limits are at ±50 percent of the specification (see Figure 2).

To set up the process capability, five subsequent units must fall between the pre-control limits in the green region. After this condition is met, two successive units are periodically sampled. If the two units fall in the green zone, continue production. If one unit falls in the green zone and the other falls in the yellow, continue production. If both units fall in the yellow zone, stop and adjust the process. If one unit falls in the red zone, stop and adjust the process. To resume normal production five units in a row must be within the green zone. The sample frequency is determined by dividing the interval between stoppages by six.

Control Charts

Control chart philosophy (Taguchi Loss Function) states that as the parameter (x) varies about the target (T) there will be a loss [L(x)] to society. Therefore, a part produced at the target is more valuable than a part produced at the specification limits. This is because throughout the value stream accommodations have to be made to be tolerant to that variation from the target value. That adds cost to subsequent steps in the value stream. (See Figure 3.)

Taguchi loss function

Control limits are chosen so that time is not misspent by looking for unnecessary trouble. The practical goal is to take action only when necessary. Control limits are calculated by estimating the standard deviation of the sample data adjusted for sample size and multiplying that number by three. That number is then added to the average for the upper control limit and subtracted from the average for the lower control limit. The control chart tests are design to flag points that are not behaving “normally” (i.e., exhibiting special cause variation).

Control chart focuses on the variation that is due to the process itself. Control limits are developed from the process data and not tied to the specification limits. This is commonly referred to as voice of the process (VOP) as the process is providing information about itself.

Comparison of Control and Pre-Control Charts

Pre-control works with compliance between customer specification, the voice of the customer. Control charts are measuring process variation or VOP. Pre control charts have limited use as an improvement tool, they do not detect shifts, drifts and trends with statistical certainty as control charts or run charts do. See basic comparison between them in table below:

Pre-Control ChartsControl Charts
Protects the customerThe goal of pre-control chartsIn conjunction with process capability
Useful in process improvementMinimally usefulHighly useful
Variation inflation riskLikelyMinimal
Ease of useMust develop manually or write custom software. Charting not required.Readily available software. Chart-based.
Broadly acceptedNoYes
Conductive to rational subgroupingNoYes
Statistically validQuestionedYes

Conclusion

Pre-control charts are possible helpful tool when are used after changeovers. They can help to roughly center the process until there are enough values to calculate control limits and reestablish capability. For that is suggested to slightly modify the rules: “If…, stop and adjust the process” should be changed to “If …., stop and investigate the process”. By using this slightly modified pre-control charting as part of a changeover procedure the customer can be protected until stability, control and capability can be established.

Download our e-book

Download our free e-book to discover how GQ Interim can transform your business with expert leadership solutions!

Interested in Interim Expert?

Discover how interim management can dramatically increase the efficiency of your business. Get in touch with our team to learn how working with GQ Interim will improve your company.

Related articles

Author

Interested in our
services?

Get in touch with our team to discuss your Project or join our network of Experts.