The Juran trilogy is Joseph M. Juran’s model for managing quality through three connected processes: quality planning, quality control and quality improvement. Planning designs products and processes that can meet customer needs, control keeps them performing as planned, and improvement breaks through to a better level than ever reached before.
Juran built the model on a parallel with finance, and money still matters. In a 2026 Lumafield survey of 210 North American quality decision-makers, 42% said quality-related costs take more than 5% of revenue, and 58% believed at least a quarter of their true quality costs go unaccounted for.
- Three universal processes, presented by Juran in 1986: quality planning, quality control and quality improvement.
- Quality control removes sporadic spikes. Only quality improvement reduces chronic waste, the level a plant has learned to live with.
- Most chronic waste is planned in, so lessons from improvement must go back into planning.
- In a plant: APQP and FMEA for planning, control plans and SPC for control, 8D and Six Sigma projects for improvement.
What is the Juran trilogy?
The Juran trilogy, also called the quality trilogy, is a universal way of managing for quality through three processes: quality planning, quality control and quality improvement. Juran first presented it in his paper “The Quality Trilogy: A Universal Approach to Managing for Quality”, given at the ASQC Annual Quality Congress in Anaheim, California, on 20 May 1986.
Juran called each process universal because it follows the same sequence of steps in any function, at any level and for any product line. He first spoke of the “quality trilogy”; the name Juran trilogy came from his Juran Institute colleagues.
Juran wanted upper managers to run quality the way they ran money, so he set each process next to a financial one:
| Trilogy process | Financial parallel | End result (Juran, 1986) | Typical tools in manufacturing |
|---|---|---|---|
| Quality planning | Budgeting | A process capable of meeting quality goals under operating conditions | Voice of the customer, APQP, FMEA, design reviews, control plans |
| Quality control | Cost and expense control | Operations run in line with the quality plan | Control plans, SPC, inspection, layered process audits, reaction plans |
| Quality improvement | Cost reduction, profit improvement | Performance at a level never reached before | Improvement projects, 8D, Six Sigma DMAIC, Pareto analysis, kaizen |
Juran defined quality as fitness for use, with two meanings: product features that meet customer needs, and freedom from deficiencies. The trilogy is the management system that delivers both.
What is quality planning in the Juran trilogy?
Quality planning is the process of preparing to meet quality goals. It designs the product and the process that will make it, so that the process can reach the goals under real operating conditions, with design, purchasing, production and the customer giving input early.
The planning road map from Juran’s Quality Handbook, as summarized for NHS quality leads has six steps:
- Establish the project and its quality goalsDefine what is designed and the goals it must reach.
- Identify the customersEnd users, the next process, internal departments, suppliers.
- Discover the customers' needsIncluding the needs they do not state.
- Develop the product featuresDesign features that respond to those needs.
- Develop the process featuresDesign a process able to make them at the required level.
- Set up process controls and transfer to operationsDefine the controls, prove capability and hand over to production.

Juran argued that weak planning is the main source of chronic waste. A process designed with built-in weaknesses keeps producing scrap, rework and complaints until someone changes the design. See cost of quality examples for what those costs look like in a plant.
What is quality control in the Juran trilogy?
Quality control is the process of meeting quality goals during operations. It keeps the process working as planned and prevents adverse change. It does not try to improve the process. Juran described it as a feedback loop that runs every shift:
- Choose what to control: the product and process characteristics that matter.
- Set the target and the limits for each one.
- Measure the actual performance.
- Compare it with the target.
- Act on the difference, using a reaction plan.

Control is built for sporadic problems, such as a jump in defects after a tool breaks. A firefighting team removes the cause and brings the process back to its usual level. That usual level can still hold a lot of waste, and control does not question it. Statistical process control is the main tool for telling the two apart.
What is quality improvement in the Juran trilogy?
Quality improvement is the process of breaking through to unprecedented levels of performance. Juran called it breakthrough. It attacks chronic waste, the defects and losses a plant accepts because they are always there. It needs upper management to add it on purpose; it never happens on its own.
Juran insisted that improvement happens project by project, where a project is a problem scheduled for solution. Joseph M. Juran, engineer and quality management consultant, wrote in the 1986 paper that an emerging database showed quality improvement projects give “a higher return on investment than virtually any other investment activity”. His sequence: prove the need, identify projects, organize teams, diagnose causes, provide remedies, prove they work and hold the gains.
For the diagnosis, a structured problem-solving method such as 8D keeps the team on causes rather than symptoms, and a Pareto chart picks the vital few problems first.
What are Juran's 10 steps to quality improvement?
Juran’s 10 steps turn quality improvement into a company-wide routine. They sit inside the improvement process of the trilogy and are often called Juran’s 10 points for quality management. A common summary, listed by Quality Gurus, runs as follows:
- Build awareness of the need and the opportunity to improve.
- Set goals for improvement.
- Create plans to reach the goals.
- Provide training.
- Carry out projects to solve problems.
- Report on progress.
- Give recognition for success.
- Communicate results.
- Keep score.
- Maintain momentum.
How do you read the Juran trilogy diagram?
The Juran trilogy diagram shows all three processes on one chart. Time runs along the horizontal axis and the cost of poor quality up the vertical axis, so higher is worse. Planning comes first, operations follow, and improvement lowers the whole band of waste to a new level.
In the Juran Institute version of the diagram, more than 20 percent of the work must be redone after launch because of failures planned into the process. A sporadic spike then lifts the failure level above 40 percent, and quality control brings it back to about 20 percent. Juran called that band the original zone of quality control. Improvement then drives the chronic level far lower, into a new zone of quality control, and the lessons learned feed back into planning.
| Aspect | Sporadic spike | Chronic waste |
|---|---|---|
| What it is | A sudden change from the usual level | The usual level itself |
| Typical cause | Tool breakage, wrong material, human error | Weaknesses planned into the product or process |
| Who handles it | Operating forces, firefighting team | Project team with a management sponsor |
| Trilogy process | Quality control | Quality improvement |
| Result | Back to the planned level | A new, lower level |
The interim management guide for manufacturing companies
How to brief, hire and onboard an interim expert for a quality project, with checklists for your next assignment.
- When an interim expert pays off
- How to write a mandate
- The first 30 days, week by week
Why is the Juran trilogy still important?
The trilogy still matters because most companies remain strong in control and weak in planning and improvement. Juran showed this in 1986 with upper managers’ ratings of their own companies: 44% rated quality control as good, while 55% rated quality improvement as not passing and 47% said the same of quality planning.
He linked the gap with Japan to the number of improvement projects completed year after year. American steel managers reported a cost of poor quality of about 10 to 15% of sales for factory processes, while Japanese mills with comparable equipment ran at about 1 to 2%.
How does the Juran trilogy compare with Deming's PDCA and Six Sigma?
The trilogy gives other quality models a place rather than competing with them: PDCA and Six Sigma are methods used inside the three processes, while the trilogy describes how management organizes quality as a whole.
| Model | Main focus | How it fits the trilogy |
|---|---|---|
| Juran trilogy | Quality managed as three processes, measured in money | The overall framework |
| Deming PDCA or PDSA cycle | A repeating loop of plan, do, check or study, act | A way to run control and improvement steps |
| Six Sigma DMAIC | Projects that cut variation and defects in an existing process | Matches quality improvement |
| Design for Six Sigma, DMADV | Design of a new product or process | Matches quality planning |
| Crosby’s four absolutes | Zero defects, price of nonconformance | Same focus on the cost of poor quality |
Juran put more weight on money and project-by-project improvement, Deming on statistical thinking and the whole system. More: continuous quality improvement for PDCA, lean vs Six Sigma, Crosby’s four absolutes of quality and the principles of TQM.
How do you apply the Juran trilogy in a manufacturing plant?
Most plants already run all three processes, but in separate departments that rarely talk to each other. Applying the trilogy means connecting them. In plants that work to ISO 9001 or IATF 16949 the mapping is direct, from APQP and PFMEA with a control plan to SPC and 8D:
- Planning: run APQP for every new product and process change, with FMEA and a control plan before series production.
- Control: follow the control plan, use SPC on the key characteristics and give every operator a clear reaction plan.
- Improvement: rank chronic losses by cost, open a project for each of the largest, give it a sponsor and close it with 8D or a Six Sigma project.
- Feedback: put lessons learned into the FMEAs and the next APQP, so the same problem is not planned in again.
- Measurement: report the cost of poor quality monthly in money, so management sees the chronic waste.
Illustrative example (not a GQ client case): a plant scraps about 30 machined parts in every 1,000 and treats it as normal. Control holds that level and reacts when a tool breaks. A project finds the fixture lets the part move, changes it and brings scrap under 10 in 1,000. The control plan is updated to the new level, and the fixture rule goes into the planning checklist for the next part.
Many plants are good at control and run some improvement projects, but never feed the lessons back into planning. New products then repeat old problems. Juran’s point was that all three processes must work as one system.
How is the Juran trilogy used in healthcare and services?
The trilogy works the same way outside manufacturing, because Juran designed it for any process, from an office to a hospital ward. In the UK, an opinion piece for the NHS Q community describes the trilogy, alongside Deming’s PDSA cycle, as the basic building blocks of a quality management system for the NHS.
In a hospital, planning designs a care pathway, control keeps it stable, and improvement projects cut chronic problems such as delays or avoidable harm.
What are the strengths and limitations of the Juran trilogy?
Strengths. The model is simple, links quality to money, which wins management support, and works with any tool from FMEA to SPC to 8D.
Limitations. It says what to do, not how, so it needs people trained in statistical and problem-solving methods. It says little about culture (see quality mindset). Results take months, and smaller companies should start with their largest losses.
Who was Joseph Juran and what is he known for?
Joseph M. Juran (1904 to 2008) was an engineer and management consultant and one of the founders of modern quality management. He is best known for the Juran trilogy, the Quality Control Handbook, the cost of poor quality and for bringing the Pareto principle into quality work as the vital few and the useful many.
The Quality Control Handbook first appeared in 1951. In the mid-1950s he taught quality management to Japanese executives. In 1979, at 75, he founded the Juran Institute, which teaches the trilogy as quality by design, process control and Lean Six Sigma.
How GQ interim helps
Putting the trilogy to work usually needs someone with the experience and the mandate to connect planning, control and improvement. An interim manager can set up the structure, lead the first improvement projects and hand a working system over to your team.
GQ interim was founded in 2011 and has run 2,560+ projects since 2015 across Central and Eastern Europe. Our database holds 7,500+ experts, including interim quality managers who have led APQP, stabilized launches and reduced the cost of poor quality in automotive and industrial plants. We are certified to ISO 9001 and TISAX.
Conclusion
The Juran trilogy turns quality into three management processes: plan it, control it and improve it. Control holds today’s level, improvement raises it, and planning stops old problems from returning in new products. Connect the three and measure the cost of poor quality in money.
Connect planning, control and improvement with an expert
Tell us where launches, scrap or complaints are hurting you. We come back with profiles of quality experts who have solved it before.
Frequently asked questions
What are the three main components of the Juran trilogy?
Quality planning, quality control and quality improvement. Planning designs products and processes that can meet customer needs, control keeps them performing as planned, and improvement raises performance to a level never reached before.
What is the Juran quality trilogy?
It is Joseph Juran’s universal model for managing quality, presented in 1986. It treats quality like finance, with planning as the budget, control as cost control and improvement as cost reduction.
What are Juran's 10 points for quality management?
Usually Juran’s 10 steps to quality improvement: build awareness, set goals, plan, train, run projects, report progress, give recognition, communicate results, keep score and maintain momentum.
What is Joseph Juran known for?
The Juran trilogy, the Quality Control Handbook (1951), the cost of poor quality, the Pareto principle in quality work (the vital few) and his teaching of quality management in Japan in the 1950s.
How does the Juran trilogy relate to Six Sigma?
Six Sigma DMAIC projects match quality improvement, and Design for Six Sigma matches quality planning. The control phase of DMAIC hands the result back to quality control.
What is the difference between Juran and Deming?
Both stressed management and data. Juran framed quality as three managerial processes and spoke the language of money and projects. Deming focused on statistical thinking, the PDCA cycle and the system as a whole.